BICESTER  1,000 UNITS

PRIVATE HOUSING

Low Carbon Modular Homes

 

Bicester New Build Development designated as an Eco Town.

 

Phase 1     1,710 units

of which 700 are on site affordable.

 

Total project size  15,000 units.

 

-  3, 4 and 5 Bed houses

-  2 and 3 Bed bungalows

-  2 Bed apartments (maximum 4 floors)

-  Low Cost

-  3 Bedroom House from £86,000

-  4 Bedroom House from £99,000

-  Minimum Foundations Required

-  3 Months Delivery and Build

-  Quicker Time to Market

-  Precision Factory Manufacturing

-  Extra Large Windows

-  High Thermal Insulation

-  Air Tight

-  Low Carbon Footprint

-  Solar Panels on each house / apartment

-  Sustainable Homes - Codes 4 & 5

 

 

.

BICESTER  700 UNITS

AFFORDABLE ECO HOUSING

Low Carbon Modular Homes

 

Bicester New Build Development

- Britain's 1st Eco Town

 

Phase 1  1,710 units of which 700 are on site affordable.

 

Total project size is 15,000 units.

 

-  3, 4 and 5 Bed houses

-  Bungalows

-  2 Bed apartments (maximum 4 floors)

-  Lower Cost

-  3 Bedroom Houses from £86,000

-  4 Bedroom House from £99,000

-  Minimum Foundations Required

-  Rapid Delivery and Build

-  Precision Factory Manufacturing

-  Extra Large Windows

-  High Thermal Insulation

-  Air Tight

-  Low Carbon Footprint

-  Solar Panels on each house / apartment

-  Sustainable Homes - Codes 4 & 5

 

STUDENT HOUSING

150 - 800 UNITS

UK WIDE - MULTIPLE PROJECTS

 

RDA are working on multiple Student Housing Projects throughout the UK.

 

We have been selected due to the following factors.

 

  • 20% - 40% Cost Reduction
  • Speed of Manufacture & Assembly
  • Guaranteed Quality
  • Turnkey Affordable Housing
  • Faster Return on Investment
  • 75% Reduced Heating
  • Precision Factory Manufacturing
  • Extra Large Windows
  • ECO Credentials
  • High Thermal Insulation
  • Low Carbon Footprint

PRIVATE RENTED SCHEME 1

 

AFFORDABLE

 

This scheme is price sensitive

20% discount to market rent

s106 planning condition

 

We have been selected due to the following factors.

 

  • 30% - 50% Cost Reduction
  • Speed of Manufacture & Assembly
  • Guaranteed Quality
  • Turnkey Product
  • Faster Return on Investment
  • Rented 6 - 9 months earlier
  • 75% Reduced Heating
  • Precision Factory Manufacturing
  • Extra Large Windows
  • High Thermal Insulation
  • Low Carbon Footprint

 

PRIVATE RENTED SCHEME 2

 

PREMIUM

 

Some of our PRS Schemes are aimed at the higher end of the market.

 

End users expect Luxury finish and facilities such as, Concierge, communal cinema, gymnasium ...

 

We have been selected due to the following factors.

 

  • 20% - 30% Cost Reduction
  • Speed of Manufacture & Assembly
  • Guaranteed Level of Quality
  • Turnkey Product
  • Faster Return on Investment
  • Rented 6 - 9 months earlier
  • 75% Reduced Heating
  • Precision Factory Manufacturing
  • Extra Large Windows
  • High Thermal Insulation
  • Low Carbon Footprint

 

AFFORDABLE HOUSING

UK Wide

 

 

RDA specialise in Local Authority and Housing Association specification affordable housing.

 

Specifications are unique to each scheme.

 

Minimum project size is 100 units for modular construction.

 

Orders for pilot  / demonstration homes on site are encouraged.

3* HOTEL

BICESTER

 

We can produce  2* - 4* hotels both quickly and to a fixed price.

 

With full factory fit out and rapid deployment

- Enabling a Swift Return on Investment

 

Sample pricing for a 200 bed hotel

 

1 Bedroom & Bathroom module from £36,000

1 Bedroom Deluxe & Bathroom    from £41,000

1 Bedroom Junior Suite                   from £50,000

1 Bedroom Suite                              from £57,000

 

Precision off site manufacturing offers Hotel operators with precise opening dates.

 

Our design team can deliver bespoke solutions with a full range of external finishing and branding options.

 

PRIVATE RENTED SCHEME 2

 

STANDARD

 

Many of our PRS Schemes are aimed at the mass market.

 

End users expect good quality and value for money.

 

We are usually selected due to the following factors.

 

  • 20% - 40% Cost Reduction
  • Speed of Manufacture & Assembly
  • Consistent Level of Quality
  • Turnkey Product
  • Faster Return on Investment
  • Rented 6 - 9 months earlier
  • 75% Reduced Heating
  • Precision Factory Manufacturing
  • Extra Large Windows
  • High Thermal Insulation
  • Low Carbon Footprint

 

© RDA 2019  All rights reserved