3D  MANUFACTURING

 We pride ourselves on our ability to offer market leading

Cost Effectiveness, Speed of Manufacture and Build Quality,

unprecedented within our industry.

 

RDA is a pioneer in Mass Production

&

Automation.

 

Using next generation 3D Printing & Injecting &

Manufacturing technologies;

along with

very advanced chemistries and material sciences;

adapted from aerospace

 

We can manufacture at a higher rate,

with consistent quality

and at lower cost than the general market.

 

 

BENEFITS OF PRECISION FACTORY MANUFACTURING

 

The benefits of factory manufacturing are compelling:

 

    • 20% - 40% Cost Reduction
    • Speed of Manufacture & Assembly
    • Guaranteed Level of Quality and Consistency

 

    • 75% Reduction in Cost Overruns
    • Faster Return on Investment
    • 75% Reduced Heating

 

    • 10 years warranty
    • 60 years warranty on core building materials
    • Precise Factory Controlled Conditions

 

    • Immune to The Skills Shortage in Construction
    • Not dependent on the weather
    • Less reliance on subcontractors and on-site labor

 

    • Improved Product with Larger Rooms & Higher Ceilings
    • Larger Windows and more Natural Light
    • Reduced Heating Bills

 

    • 60% Less Lorries
    • 90% Less Waste
    • Reduced Noise & Pollution on Site

 

    • Turnkey Housing Schemes
    • ECO Benefits are substantial
    • Improved Health and Safety

 

 

DESIGN for MANUFACTURE and ASSEMBLY

(DfMA)

 

Our Design for Manufacture and Assembly (DfMA) processes are cutting edge and enabling a quantum leap in Reducing Build Costs and Rapid Project Completion.

 

These yield huge improvements in quality control and guaranteed deliverables.

 

 

COST REDUCTIONS

 

On Site Labor savings  up to 90%

Material savings  more than 25%

Time savings  up to 80%

 

With substantial investment in Research and Development;

State of the Art Robotics

Material Sciences

and the Science of Mass Production

we can achieve the above reductions in labour and material costs.

 

The net effect is to reduce the price of comparable units by 20 - 40%.

 

 

SPEED OF MANUFACTURE

 

Automated manufacture on multiple parallel production lines

enables a speed of production never seen before.

 

Each production line is capable of producing one house

per hour.

 

 

SPEED OF ASSEMBLY

 

Using cutting edge technology and building methodologies

we assemble an average 3 - 4 bedroom house in 3 days.

 

Ready for occupation in a week.

 

The conventional build time of a house is 6-9 months.

For blocks of apartments this stretches into years.

 

Using modern lightweight materials - stronger than steel by weight,

the foundations take only 25% of the time and cost to prepare.

 

 

FASTER RETURN ON INVESTMENT

 

With rapid methods of on-site construction,

completed projects are delivered up to 12 months earlier.

 

Landlords and Hoteliers mitigate risk

and

Receive Rent 12 months sooner

 

 

GUARANTEED QUALITY

 

Precision Laser and 3D Defect Tracking

accurate to within 0.5mm

feature at every stage of the production process.

 

Ensures higher quality construction with factory and line level quality control.

 

Guaranteeing a level of quality control not possible

with conventional on site construction.

 

Manufacturing housing in factories

is unaffected by the damage and delays caused by weather

and a varied labour workforce,

 

 

HEALTH & SAFETY

 

 Our Modern Methods of Construction (MMC) are best in class:

far safer, cleaner and more labour efficient

than conventional construction.

 

We avoid many of the heavy loads that workers have to handle

whilst also reducing the labour and time on site by 90%.

 

 

SKILLS SHORTAGE

 

The Industry is suffering from an acute shortage in skilled construction workers.

 

This shortage of labour along with increased labour costs

is universally accepted to considerably worsen.

 

A fast bricklayer costs £250 per day;

with similar rates for good electricians and plumbers.

 

A semi skilled factory worker can be paid £10 per hour;

and a supervisor £15 - £20 per hour...

 

There is an ageing workforce in construction that is not being replaced.

Only 20% are entering apprenticeships compared to 40 years ago.

 

We are recruiting and training a permanent and highly-skilled workforce

- reducing the reliance on subcontracted labour.

 

 

 

 

© RDA 2019  All rights reserved